Technical brief / VGS-P5-20
Indirect costs and allocation assumptions in bid worksheets
Indirect-cost assumptions should be visible enough to explain the offer and prevent the same expense from appearing twice or being omitted altogether.
Indirect-cost assumptions should be visible enough to explain the offer and prevent the same expense from appearing twice or being omitted altogether.Listen to the summary
Read the narration transcript
Indirect costs and allocation assumptions in bid worksheets. Indirect-cost assumptions should be visible enough to explain the offer and prevent the same expense from appearing twice or being omitted altogether.
Bid decision
Use an internal allocation method that reflects the work and is consistent with applicable contract requirements. Separate direct project effort from shared supervision, administration, facilities, and other indirect resources. An internal pricing allowance does not, by itself, establish that a cost is allowable or reimbursable under a particular contract.
Reference: [far]
Workflow and evidence
Finance documents each pool, allocation base, estimate period, and source of rates. Operations checks whether project-specific supervision or equipment was already included directly. The reviewer traces calculations from inputs to line prices and tests sensitivity to workload changes. The proposal lead provides only the cost detail requested and preserves the fuller workbook for internal review.
Hypothetical example
In a hypothetical facility bid, a supervisor’s hours appear in direct labor and again in a shared management allowance. Finance identifies the overlap, corrects the treatment, and records the rationale before the approving manager assesses the revised margin.
RFQ review checklist
- Define each indirect pool and its allocation base.
- Check direct and indirect treatment for duplicate expenses.
- Preserve rate sources, periods, and calculation formulas.
- Distinguish internal pricing from contractual cost-recovery requirements.
Primary sources & starting references
Related full article
A measurable SOW for institutional janitorial procurementThese editorial briefs support project planning. They are not legal opinions, credentials or a determination of contract eligibility. Verify the solicitation, agency deviations and applicable requirements for the project. Examples are hypothetical.