Technical brief / VGS-P3-29

Retention schedules based on applicable contract requirements

A retention schedule should explain why a record is kept, which requirement controls it, and what event starts the relevant period.

Federal & State Procurement ComplianceNAICS 561720 / 561210 / 425120 / 423850 / 488510Editorial edition · November 7, 2026
A retention schedule should explain why a record is kept, which requirement controls it, and what event starts the relevant period.
Illustrative imageFound5dollar · CC BY-SA 4.0Cropped WebP

Listen to the summary

Read the narration transcript

Retention schedules based on applicable contract requirements. A retention schedule should explain why a record is kept, which requirement controls it, and what event starts the relevant period.

Buyer decision

Read the contract, incorporated provisions, agency instructions, and applicable legal requirements before setting destruction dates. Different record categories may require different treatment. Avoid applying a single remembered period to every procurement file or deleting material simply because an internal project has closed.

Reference: [far]

Workflow and evidence

Build a retention matrix by record category, authority reference, triggering event, owner, access restrictions, and planned disposition. Obtain review for conflicting requirements and any hold affecting disposal. Keep copies controlled so deleting one folder does not leave unmanaged duplicates. Require documented approval before disposition and retain evidence of the action without preserving unnecessary sensitive content indefinitely.

Hypothetical example

Hypothetically, a supplier closes a facilities project but an invoice dispute remains unresolved. Its records owner flags the affected documents for review and postpones scheduled disposal while determining the applicable preservation instructions.

RFQ checks

  • Identify the controlling retention references.
  • Define record categories and period starting events.
  • Check disputes, investigations, or other preservation holds.
  • Approve disposition and document what was completed.

Primary sources & starting references

  1. Acquisition.gov — Federal Acquisition Regulation (opens a new tab)
  2. Acquisition.gov — Agency FAR deviations (opens a new tab)
  3. SAM.gov — Entity registration (opens a new tab)

Related full article

NAICS and SAM readiness for a hybrid goods-and-services requirement

These editorial briefs support project planning. They are not legal opinions, credentials or a determination of contract eligibility. Verify the solicitation, agency deviations and applicable requirements for the project. Examples are hypothetical.